• Home
  • About Us
    • What We Do
    • Projects
    • Funding Partner
  • Solutions
    • For Businesses
    • For Landlords
    • Project Consultancy
    • EPCs & Installers
  • Sustainability
  • Insights
    • Insights
    • Video Library
  • Contact
  • More
    • Home
    • About Us
      • What We Do
      • Projects
      • Funding Partner
    • Solutions
      • For Businesses
      • For Landlords
      • Project Consultancy
      • EPCs & Installers
    • Sustainability
    • Insights
      • Insights
      • Video Library
    • Contact
  • Home
  • About Us
    • What We Do
    • Projects
    • Funding Partner
  • Solutions
    • For Businesses
    • For Landlords
    • Project Consultancy
    • EPCs & Installers
  • Sustainability
  • Insights
    • Insights
    • Video Library
  • Contact

Our Projects

A selection of case studies from us and our partners

A trusted provider of solar PV

Two Blues Solar and our partner Photon Energy have an established track record in funding, installing and managing solar projects across the UK and overseas. Here is a selection of our projects:

Get in touch

Our latest solar PPA project

Take a look at our fully-funded solar project with ForFarmers below: 

Global Distribution Company

Global Distribution Company

Global Distribution Company

Location: Manchester

System size: 255 kWp

System output: 222,213 kWh

Funding type: Funded PPA

CO2 savings: 48 tCO2/year

EPC: Photon Energy


Completed - Two Blues reviewed the client’s current and future potential energy consumption profile and designed an array most suited to their usage. This project was managed in collaboration with the building’s Landlord and their sustainability priorities, ensuring that all parties were content with the final PV solution.


Read More

Livestock Feed Manufacturer

Global Distribution Company

Global Distribution Company

Location: Newcastle-under-Lyme

System size: 165 kWp

System output: 146,000 kWh

Funding type: Funded PPA

Year-1 savings: 33 tCO2/year

EPC: Photon Energy


Completed - Two Blues worked with the client to assess the best starting point for solar within its portfolio. This system was designed to meet both the expectations of insurers and local regulatory demands regarding new installation sizes. Working with Photon, the system will provide a visible sustainability win for the company and act as a launchpad for further solar rollout. 

Read more

Commercial Shopping Centre

Global Distribution Company

Commercial Shopping Centre

Location: London

System size: 684 kWp

System output: 590,000 kWh

Funding type: Funded PPA

CO2 savings: 128 tCO2/year

EPC: Photon Energy


Ongoing - Two Blues is working with a commercial landlord to fund a rooftop installation for a large London shopping centre. TBS scoped potential roof space for solar, including utilising disused car-parking areas, before designing a suitable system for the site. The system will connect into the landlord supply, producing significant financial and carbon savings for the site.

Airport Business Park

Automobile Design Centre

Automobile Design Centre

Location: Southend

System size: 500 kWp

System output: 454,000 kWh

Funding type: Self-funded

CO2 savings: 234 tCO2/year

EPC: Photon Energy


Completed - Photon completed this rooftop installation during winter conditions as part of an effort to help the newly built business park achieve a 'very good' environmental BREEAM rating. This built on Photon's previous project of 119 kWp at the airport, the largest UK airport solar installation at the time.

Automobile Design Centre

Automobile Design Centre

Automobile Design Centre

Location: Gaydon

System size: 535 kWp

System output: 454,000 kWh

Funding type: Self-funded

CO2 savings: 234 tCO2/year

EPC: Photon Energy


Completed - Photon worked alongside the client's engineering consultants to design and build a large roof-mounted solar PV system for the design centre in Gaydon. Photon installed a large system which satisfied local regulatory requirements as well as the building's loading restrictions.

Waste Management Company

Automobile Design Centre

Waste Management Company

Location: Basildon

System size: 306 kWp

System output: 226,100 kWh

Funding type: Self-funded

CO2 Savings: 117 tCO2/year

EPC: Photon Energy


Completed - Photon coordinated with the engineering company contracted to build the new Mechanical and Biological Treatment facility, designing a system which met the energy efficiency requirements in the building's planning consent. The system delivers approximately 10% of the electricity requirement on-site.

Get in touch

To enquire about fully-funded solar which saves your business money and contributes to your sustainability goals, reach out below:

Contact Us

Follow us on LinkedIn to hear industry insights and learn more about what we do

  • Home
  • What We Do
  • Projects
  • Funding Partner
  • For Businesses
  • For Landlords
  • Project Consultancy
  • EPCs & Installers
  • Sustainability
  • Insights
  • Video Library
  • Contact
  • Privacy Policy

Powered by

Cookie Notice

We use cookies to analyse website traffic and optimise your website experience.

DeclineAccept